Kindergarteners are pretty smart, especially when it comes to things like insulation, drywall and gypsum concrete underlayment!

Kinzler Construction Services President and CEO Tanner Kinzler took Kindergarten students at Bergman Academy on a tour of the construction site at their school in Des Moines, IA. Kinzler was hired to install batt insulation and gypsum concrete underlayment in the school’s new addition.

Watch this short video to see what these adorable kids learned!

Project Profile: Pioneer Production Plant

The team at Dupont Pioneer’s Toledo Production Plant needed a solution for their roof problems to prevent damage to product inside their warehouse. They hired Kinzler Construction Services to apply spray foam to the ceiling of this 40,000 sq. ft. building, insulating them from the elements and any future worry!

Kinzler Construction Services delivers an industry-leading customer experience. Learn more about our spray foam installation services and contact us today at 888-292-2382 to see if spray foam is the right product for your project.

Pioneer 1
Pioneer 2
Pioneer 3
Pioneer 4

 

Project Profile: Paper Source

Paper Source is a premier paperie and gift retailer, opening a new location at a former work-out facility in St. Paul, Minnesota. When their contractor, Tom Hammer Construction, removed the flooring during renovations, they discovered that the floor was uneven, full of holes, and in some areas, 1 1/2″- 2″ below the original floor.

Kinzler Construction Services solved their problem by installing USG Durock™ Brand Quik-Top™ Self-Leveling Underlayment. This flooring sets and dries extremely quickly, minimizing downtime – ideal for commercial and institutional repair and renovation projects. This solution kept the contractor on schedule and everyone was very pleased with how the flooring turned out!

Learn more about Kinzler’s Gypsum Concrete Underlayment installation services.

Before:

Before2
Before

After:

After
After2

Project Profile: Vertical Endeavors Climbing Facility

Rock climbing is one of the fastest growing sports in the United States and Vertical Endeavors is one of the recognized leaders in the industry, operating some of the largest indoor climbing facilities in the nation. When they started work renovating a warehouse in Bloomington, MN to become a new climbing facility, they called on Kinzler Construction Services to take insulation installation to new heights — literally. The roof of the warehouse where the tallest climbing walls will be are 63 feet in the air! Kinzler crews mobilized quickly.

A team from Kinzler’s Minneapolis branch used an articulating lift to spray closed cell foam insulation on the roof and walls. Closed cell spray foam was a great choice because it acts as a water vapor and air barrier plus has an R-value of 6 per inch. And since the foam will be left exposed, we painted the foam with an intumescent paint.

Before Photos:

20151116_082238
20151116_082214

After Photos:

20160317_132746
20160317_132800

Project Profile: Cedar Falls Apartment

Dahlstrom Real Estate needed a flooring solution for their new 8-unit apartment in Cedar Falls, IA, which would satisfy fire rating requirements and reduce sound between units. They hired Kinzler Construction Services to install Levelrock 2500 gypsum concrete underlayment. Gypsum concrete is a building material used as a floor underlayment in wood-frame and concrete construction for fire ratings, sound reduction, radiant heating, and floor leveling.

Kinzler crews installed 1 ½” Levelrock 2500 gypsum concrete underlayment over 2-1/2″ poly-styrene. The substrate was precast floor and wood subfloor on the 2nd and 3rd floor.

Contact us to learn more about how Kinzler Construction Services can help make your project a success.

IMG_0139
Gyp Concrete
IMG_0146
IMG_0145

Project Profile. Lake Movil

Kinzler was hired by Hammerback Remodeling to insulate a custom lake home North of Bemidji, MN. Kinzler insulated the walls with five and a half inches of open-cell spray foam. Kinzler installed a hybrid insulation system in the attic, starting with three inches of open cell spray foam, and covered it with R-40 of blown fiberglass insulation to achieve an R-50 assembly. This created a very efficient and quiet home for our customer.

  • Lake Movile Pic 1

 

Project Profile. Gull Lake

Because of the “bonus truss” roof system, the customer needed to install a roof venting system and spray foam in the roof area. This also allowed the customer to place heating and air conditioning ducts in the conditioned attic space.

Gull Lake Pic 2

  

Gull Lake Pic 1

 

 